Chongqing Light Rail Construction Organization design scheme model
The project site is from Hutouyan to Daping Jiukengzi, Futuguan Park, Yuzhong District, Chongqing. Scope of work: Fotuguan Daping section tunnel (452.9 m), the rest of Daping mucking branch road (99.29 m). Including earthwork excavation, initial support, secondary lining, waterproof and drainage, open cut tunnel and portal works; Passage, air duct, entrance and exit; Stone excavation of reserved foundation pit and support foundation of track beam. This scheme has 156 pages in total, and the contents are detailed for reference