An office building Indoor and outdoor Construction organization scheme design of decoration works
Our company has set up a special group for the "Decoration Project of the Office Building of the Management Committee of Nanchang * * Economic and Technological Development Zone". The main leaders of the company, led by senior project managers, are equipped with professional engineers and technicians of all disciplines. With available social resources and cooperative manufacturers, they carefully study the bidding documents and construction drawings, and jointly study and prepare the construction organization design. 1、 Clarify the characteristics of the project and determine the main purposes and tasks of the construction organization design: 1 This project is an indoor and outdoor decoration project, which involves many aspects of construction, and the construction period is tight. 2. Ensure the design style, meet the design requirements, and complete the goal of high-quality project 3. Make the best preparation and make the greatest effort to ensure that the results are satisfactory to customers. To this end, we have formulated the general principle of "three elaborations, one high-quality product": elaborate planning, elaborate implementation, elaborate control -- to do high-quality project! 4. The purpose of this construction organization design is to make clear the work of each stage of the project and the quality standards, so that the project can be legally followed in the implementation process and guide the smooth implementation of the project. 5. Tasks to be completed in the construction organization design; 6. Plan and establish a project organization with a complete professional lineup, and define the responsibilities of each department; 7. At the same time, set up a design quality supervision group to pave the way for communication between design and construction, and supervise the construction quality on site to ensure the perfect realization of design goals; 8. Propose the preparation plan for personnel and materials at the early stage; 9. Put forward perfect quality assurance measures for the whole construction process; 10. Propose coordination methods and measures for each discipline; 11. Reasonably divide the construction working surface. Break up the whole into parts to facilitate scientific management of construction. 12. Predict possible adverse factors and potential crises. Formulate contingency plans to lay a solid foundation for the smooth progress of the project. Minimize the impact of adverse factors on the project.