The project has ten floors in total and two underground floors. The underground part is used as garage and equipment room, and the overground part is used as inpatient building and office room. The design contents include: water supply system, drainage system, hot water system, sewage system, automatic sprinkler system, fire hydrant system, air-conditioning condensate system. The water supply zone is divided into two zones. The rainwater and sewage separation system is adopted for drainage. The return period of rainwater is 50 years, the outdoor fire water consumption is 20L/s, and the indoor fire water consumption is 20L/s.
The drawings include: plan, spraying plan, spraying system schematic diagram, hydrant system schematic diagram, water tank system diagram, rainwater system schematic diagram, water supply system schematic diagram, sewage system schematic diagram, sump plan, system diagram, water supply isometric diagram of the seventh and eighth floors, drainage node diagram, toilet detail drawing, etc.