VIP free Construction Organization Design of Bank Interior Decoration Project (Technical Bid)
six
* * Provincial Branch of * * Bank of China Co., Ltd.: Thanks for your trust, our company has been invited to participate in the bidding for the renovation project of the * * * Wealth Management Center of the provincial branch, and we would like to express our deep gratitude. Our company cherishes this opportunity given by you, and will make full use of the successful experience, advanced construction organization and management measures, exquisite construction technology and warm and considerate services accumulated in our past design, construction and decoration of large high-end office buildings, star rated hotels, hotels, bank office buildings, and outlets to repay your unlimited care and support for our company. In order to further enhance your comprehensive understanding of our company, our company will set up a special bidding team. According to your relevant requirements, we will carefully study the design drawings and comprehensively analyze the structural features, architectural decoration points and difficulties of the project on how to build the project at a high level, high quality and high speed. Through in-depth and careful research, we have full confidence to complete the decoration construction of the project, and under your guidance, fully realize the quality objectives and construction period objectives of the project, and contribute our wisdom to the smooth completion of the project. In the principle of sincerity, trustworthiness and cooperation, we hereby give you the following comprehensive explanation on the bidding of this project: 1.1 Basis for preparation of bidding documents: A. Bidding documents, supplementary documents and Q&A documents for the decoration project of the provincial branch * * * Wealth Management Center. B. Construction drawings provided by the Employer. C. The company's labor, materials, machinery and equipment supply and production, technical equipment capacity and previous construction experience of similar projects. D. According to the company's quality management system and operation instructions. E. The construction and acceptance shall be carried out in strict accordance with the current national, provincial, municipal and local construction acceptance specifications, quality assessment standards and operating procedures, and the safety and civilized construction regulations shall be implemented. 1.2 Principles for preparation of bid documents: A. Meet the project quality, technical and economic standards and construction period requirements expected by Party A, and leave room for specific arrangements. B. Comprehensively plan, ensure the key points, highlight the difficulties and consider others. C. In combination with the actual project in the area, careful organization and scientific management should be carried out to improve the level of construction mechanization and the scientific content of technical organization, so as to complete the construction task with high quality and efficiency.