copyright [Guangxi] As built drawing of 7X32m whole hole prefabricated and erected simply supported box girder double track bridge in a mountainous and hilly area
ten
This document is the as built drawing of a 7X32m long simply supported box girder double track bridge prefabricated and erected in a mountainous and hilly area in Guangxi. The bridge is located on a curve. Double track bridge, jointless track, distance between tracks is 4.6m. Total length of the bridge: 243.66m, span arrangement: 7X32m whole hole prefabricated and erected simply supported box girder. The whole bridge pier and abutment are equipped with hanging baskets. Pay attention to the embedding of relevant embedded parts, and the bored pile foundation. The drawings include prestressed reinforcement layout, beam reinforcement quantity table, beam anchor sealing structural drawing, lifting point layout detail, support plate structure and support installation schematic diagram, ballast retaining wall structure and reinforcement layout, cable trough vertical wall, cover plate, shutter layout, etc. The contents are comprehensive and detailed, which can be used for your reference.