VIP exclusive Highway engineering budget estimate form (excel version)
ten
This set of tables is consistent with the tables in the Methods for Preparation of Budgetary Estimate and Budget of Capital Construction Projects of Highway Engineering (JTG B06-2007). Table of Contents 1. Summary Table of Total Estimate (Budget) (Table 01-1) 2. Summary Table of Total Estimate (Budget) Labor, Main Materials, and Machine Shift Quantity (Table 02-1) 3. Summary Table of Total Estimate (Budget) (Table 01) 4. Summary Table of Labor, Main Materials, and Machine Shift Quantity (Table 02) 5. Calculation Table of Construction and Installation Engineering Cost (Table 03) 6. Calculation Table of Comprehensive Rate of Other Engineering Costs and Indirect Costs (Table 04) 7. Calculation sheet of equipment, tools and appliances purchase cost (Table 05) 8. Calculation sheet of other engineering construction costs and recovery amount (Table 06) 9. Summary sheet of labor, materials and machine shift unit price (Table 07) 10. Calculation data sheet of construction and installation engineering cost (Table 08-1) 11. Estimate (budget) sheet of sub divisional works (Table 08-2) 12. Calculation sheet of material budget unit price (Table 09) 13. Price calculation table of self purchased material yard (Table 10) 14. Unit price calculation table of machine team (Table 11) 15. Unit quantity table of auxiliary production workers, materials and machine team (Table 12)