Senior management of a university in Beijing Student apartment Construction organization design
Preparation Note 1.1 We are very honored to participate in the bid for the "4th, 5th, 6th and 7th floor project of student apartment phase II"! We sincerely thank the tenderee for their full trust in our company, and we will cherish this rare opportunity. We are fully aware of the importance of this project, so all members of the company attach great importance to this project from top to bottom, and we will work together to do a good job in the construction organization design of this project! 1.2 After receiving the bidding documents, drawings and other engineering materials, the company has organized engineers and technicians to carefully study and repeatedly read the bidding documents and drawings, and organized various special meetings to repeatedly study, demonstrate and compare the characteristics, key points and difficulties of the project, with the purpose of making our construction organization design scientific, reasonable, detailed It has strong operability and pertinence. 1.3 After carefully studying the bidding documents and drawings, our company implements the quality assurance measures of "process quality" for the earthworks, slope protection works, waterproof works, reinforcement works, concrete works, formwork works, surveying works, winter and rainy season construction, decoration works, water and electricity equipment installation works, inspection and testing, and procurement of large mechanical equipment and materials of the project, Construction period progress assurance measures, safe and civilized construction measures and environmental protection measures. The key and difficult points of the project were carefully demonstrated and compared in the scheme design.