waterworks Project construction organization design
The project consists of fine screen room and water distribution mixing well (alkali addition, pre chlorination, alum addition), grid flocculation tank, horizontal sedimentation tank, air-water backwash V-filter (chlorination), clean water tank, suction well secondary pump room, power transformation and distribution room, sludge storage tank, sludge thickening and dewatering machine room, drainage tank, dosing room, equipment, power transformation and distribution electrical system, lightning protection, automatic control, instrumentation, video monitoring system It is composed of central control workshop, process pipeline, auxiliary buildings, enclosure, greening, plant road, water supply and drainage pipeline, etc.