Uploaded on: 2023-12-08 14:53:14
zero
5 points

Firstly, the main engineering design of the tunnel is carried out, including the tunnel horizontal alignment design, tunnel cross and vertical section design, lining inner contour and tunnel length; The support parameters of the tunnel composite lining structure are determined, including the diameter and length of the anchor bolt, the thickness of the shotcrete and the thickness of the secondary lining. Then a series of preparations before tunnel construction are described

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment