Construction organization design of 110 kV power transmission and transformation project
Substation building, installation, commissioning works (including fire civil engineering, image monitoring and safety protection system, telecontrol system), termite prevention, safety, health and environmental protection production and installation, etc. within the scope of construction drawings. Construction works include but are not limited to large-scale earthwork, site leveling, temporary works (including temporary construction power supply, water source and roads), slope protection, retaining wall, enclosure, flood control and drainage, access road, relocation of Pingding Station, transportation of foundation trench surplus soil, with a transportation distance of 20km, etc, The scope of this bidding does not include fire protection works (equipment and pipes in the pump room, fire alarm, main transformer water spray, gas fire protection), greening works, 10kV insulated copper tube bus installation, microcomputer five prevention system and remote control system (outside the station). The specific bidding scope shall be in accordance with the construction drawings. This document is the construction organization design of 110 kV power transmission and transformation project, totaling 103 pages.