1、 Project overview:
The building is located in Zhejiang Province and serves as the tourist center of the scenic spot
2、 Cold and heat sources:
Adopt environmental protection new refrigerant series variable refrigerant flow air conditioning system, and each floor is equipped with an independent air conditioning system
3、 Air conditioning system:
1. Air conditioning system form: fan coil units are used in the office area, and total heat exchanger is used for fresh air to realize heat recovery.
2. Automatic control of indoor and outdoor air conditioning units is centralized in the duty room
4、 Energy saving system:
1. Building automatic control system is adopted for air conditioning and ventilation to obtain effective use and energy-saving effect.
2. The outdoor unit of variable refrigerant air conditioner is composed of several variable frequency compressors, which can automatically and flexibly adjust the energy according to the change of indoor air conditioning load
There are 7 drawings prepared in 2012.