Cinema air conditioning and ventilation design and construction drawings
Building function: commercial building, entertainment and catering building type: high-rise building basement: garage, other design stages: construction drawing design content: air conditioning, ventilation, machine room, boiler, fire prevention and smoke exhaust design description: Yes, thermal insulation and corrosion prevention, construction and installation requirements Cold and heat sources: hot water boiler, gas boiler Number of drawings: less than 20 Data Catalog Design, General Description of Construction Main Equipment and Materials List of Air conditioning and Smoke Exhaust System (Cinema) Air conditioning Water System Schematic Diagram Boiler Room Equipment, Pipeline Plan Refrigeration Room Equipment, Pipeline Plan Browse Detailed Catalog>>The content introduction manuscript is the design and construction drawings of air conditioning and ventilation of a cinema in a commercial complex building in Wuhan; The building consists of a 28 storey tower and a four storey podium, with two floors underground. The cinema on the fourth floor is equipped with a central air-conditioning system. The cold source of air conditioning in summer is water-cooled screw refrigeration unit, and the heating source in winter is 85/60 ° C hot water provided by gas-fired hot water boiler. The hot water is converted into 60 ° C/50 ° C hot water for use after being exchanged by heat exchange unit. The cinema on the fourth floor is equipped with a mechanical smoke exhaust system. Each theater 1~6 # is an independent smoke control zone, and each theater is equipped with a smoke exhaust fan; The corridor located in the theater area has one smoke control zone on each floor, and each smoke control zone is equipped with two smoke exhaust fans. The theater hall is divided into three smoke control zones, with two sets of smoke exhaust systems. The smoke exhaust and air supply of the theater hall share the air supply system of the first to third floor stores. Design content: design of air conditioning, ventilation and mechanical smoke exhaust system on the fourth floor (cinema); Design of refrigeration room and boiler room. There are 10 drawings in total.