Construction design scheme of landscape engineering of an isolation belt
4. Facilities, tools and equipment used in project construction must meet the requirements of applicable management regulations, specifications and technical regulations; 5. The materials shall arrive at the site as planned, and the site pavement shall be well protected to ensure that the materials are stacked and used reasonably from the same day to the same day, without affecting and maintaining any other required roads. After the construction is completed, the temporary roads will be removed, leveled, cleaned, and restored to the original condition, or meet the requirements of the owner; 6. Our office is responsible for the maintenance of roads and facilities during the construction period, and will restore them to the satisfaction of the owner after the construction is completed;