Construction Organization Design of Yuxi Project of Wal Mart Mall
1、 According to the Bidding Document for General Construction Contracting of Yunnan Yuxi Fanhua Commercial Plaza Wal Mart Mall, the Construction Design Drawing of Yunnan Yuxi Fanhua Commercial Plaza Wal Mart Mall (designed by Fanhua Engineering Co., Ltd.), the bidding answering documents and other relevant materials, our company has determined the scope of project contracting, quality standards and preparation requirements in the national, Yunnan Under the guidance of norms, standards and regulations at all levels of the industry, and under the high attention and direct leadership of our leadership, we have transferred elite and powerful officers to form a strong bidding team, and prepared the Technical Bid Document of Yunnan Yuxi Fanhua Commercial Plaza Wal Mart Mall, which serves as the guidance basis for on-site construction. 2、 This technical bid document consists of two parts. The first part is "construction organization design", which comprehensively and completely describes the planning, organization, coordination and implementation of the whole construction process; The second part is the "special construction scheme", which is the special construction scheme and measures formed for the specific construction items of the project. 3、 Notes on the text arrangement of the Technical Bid Document of General Contracting for Construction of Yunnan Yuxi Fanhua Commercial Plaza Wal Mart Mall: 1. This technical bid document is divided into two parts, including thirty-five chapters, of which the first part has twelve chapters, and the second part has twenty-three chapters, with "Chapter ××, ××× (title)" as the titles. 2. The main chart descriptions of the first construction organization design are arranged in the form of attached drawings and schedules; The chart of the second special construction scheme and construction measures is illustrated with illustrations (tables); The attached drawings and schedules are attached at the end of the technical bid document, i.e. after Chapter 23 of the special construction scheme, without page numbers. 3. The technical bid document is completely arranged according to the requirements of the bidding document: 1) The cover is A4 size, 157g white glossy coated paper, and the rest are printed on A4 white paper; 2) All text fonts are in Song typeface with a small size of four; 3) Do not set the header; The page number shall be set at the footer, and Arabic numerals in Times New Roman font with a small size of five shall be used and uniformly centered; 4) The text spacing adopts standard word spacing, and the line spacing is 1.5 times the line spacing. The page setting is the default setting of Microsoft Word. 4、 The "Construction Organization Design", as the technical document guiding the construction, is prepared for the construction period, quality objectives, project management organization setting and labor organization, construction schedule control, mechanical equipment and revolving materials allocation, main technical measures, safe and civilized construction and cost reduction of each division and section of the project Many factors such as the promotion of new technologies have been fully considered as far as possible, highlighting the scientific nature, applicability and pertinence.