Equipment hoisting scheme of a people's hospital
A People's Hospital is a key project in Wuhu City and even Anhui Province. The building area is 109518 square meters, with one floor underground and 23 floors above the ground of the main building. It is located in the surrounding area of Wuhu Commercial Center. The traffic location is critical. According to the design planning requirements, all large equipment in the basement can only be hoisted from the vent, and the net size of the vent is 6000X3000, and the underground elevation is - 6.0 m The underground entrance of the explosion vent is 6000X4000. The hoisting of large equipment has the characteristics of large size, heavy weight, wide working surface and great difficulty in hoisting. At the time of preparation of this plan, the general contractor has been contacted for the "three supplies and one leveling" work on the construction site, and the surrounding obstacles have been cleared and the ground has been hardened. The relatively large equipment to be mechanically hoisted in this project mainly includes: two centrifugal chillers (one of which has a net weight of 12 tons and an overall dimension of 5211X2813X3310mm; Another set has a net weight of 10.5 tons, overall dimensions of 5007X2299X3142 mm), plate heat exchanger (net weight of about 3 tons, overall dimensions of 2500X1200X2985 mm), horizontal centrifugal pump (weight less than 1 ton), etc; Construction materials, such as welded pipe, stainless steel plate, etc. The difficulty and key point is the lifting of two centrifugal chillers. According to the plan, two equipment will arrive at the site at the same time, and the lifting operation must be completed in the shortest time, so it is difficult. It is required that the equipment hoisting scheme must be effective.