Construction organization design of a large theater in Beijing
****The Grand Theater project is located at No. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *, Xicheng District, Beijing, with a total floor area of about 155000m2. It consists of three parts: the central building (202 District), the north building (201 District) and the south building (203 District). Among them, the central building is an ellipsoidal building with a long axis of 216.57m and a short axis of 145.57m, with a public hall, an opera house, a concert hall, a theater and a small theater, surrounded by pools; The building on the north side has two floors underground, with floor elevations of -7.00m and -11.50m respectively, including the main ticket hall, parking lot, entrance channel, etc; The building on the south side is three floors underground, with floor elevations of -7.00m, -11.50m and -18.00m respectively, including the ticket hall on the south side, fire vehicle entrance, cargo loading and unloading area and other supporting rooms.