The complete set of electrical construction drawings of a cold storage include vertical system diagram, power distribution system diagram, ground plane of the first floor, power plane of the first floor, power plane of the second floor, lighting plane of the first floor, roof lightning protection plan, weak current system diagram, automatic fire alarm system diagram, weak current plan of the first floor of C1 warehouse, automatic fire alarm system plan of the first floor of C1 warehouse Plan of automatic fire alarm system on the second floor of C1 warehouse
1. The strong current design of the project includes the following electrical systems: strong current system: 1) power supply and distribution system; 2) Lighting system; 3) Lightning protection, grounding system and safety measures for buildings;
2. Division of work with other professional designs: 1) The refrigeration room is further designed by professional manufacturers. This time, 13 YJV cables are reserved to the power distribution room. Refer to the system diagram for specific models. The estimated power consumption of the refrigeration room is 1200KW. 2) For places with decoration requirements, the interior decoration design unit shall be responsible for the design of corresponding lighting plane and power distribution system. This design will lead the power supply to the distribution box and reserve the decoration lighting capacity.