expressway Pavement construction organization design
The route of this project starts from the west interchange of Matjitang, Nitan Tianwan, Wutan Town, Taojiang County, and connects with the end of Yima Expressway. It passes through Gaofeng, Xianganglun Tunnel, Zhanxi, and runs west along the north side of Fuzhuxi Gold Mine, crossing Shanxi to Yangjiaotang (Yangjiaotang interchange), and along Changtianchong, Chixi Tunnel. Go through Yeyatang and Tiantouchong to Lengshi (Lengshi Interchange is set), cross Simao Creek, go west along the south side of X039, go through Bridge, Taozhu, Shatian, Boxiwan, to Longtang (Longtang Interchange is set), separate from X039, go through Sanglintai, Xiawan, Matang, go north of Muzi (Anhua Interchange), connect Dongping Town, continue to the west, set Shuijing Tunnel, Kangjiatai Tunnel, go through Qingshan, Linjiawan, Longtouswan Tunnel is set to reach Shuangqiao, the end point of the project, and connects with Guan'an Expressway, passing through Wutan, Yangjiaotang, Lengshi, Longtang, Muzi, Tuoxi and other towns. The total length of the route is 67.280km, including 9.025km in Taojiang County and 58.255km in Anhua County. The total length of LM2 contract section is 25.38.00km, and the length of Anhua connecting line is 5.58km. Among them, there are 13 bridges, no tunnels, and 2 interchanges, namely Longtang Interchange and Anhua Interchange, with Anhua Service Area and Anhua Connecting Line; There are 12 openings of central separation strip and 20 emergency parking strips.