Beijing Shopping plaza Electrical construction scheme
1. The underground second floor of the project (with mezzanine in some parts) has a maximum of 27 floors above the ground. Most of the underground second floor is used as a garage for civil defense in peacetime and wartime (Level VI material warehouse), and the underground first floor is used as a garage, power transformation and distribution station, equipment room, bicycle garage, etc. There are six buildings on the ground: 24 storey apartment in Block A, 27 storey apartment in Block C, 19 storey office building in the newly built office building, 2 storeys of shops and serviced apartments in the west, 2 storeys of shops in the east, and 3 storeys of kindergartens and public facilities. 2. Electrical engineering: mainly including high-voltage power transformation and distribution system, power lighting system, lightning protection and grounding system, fire alarm system, generic cabling system, satellite television receiving system, security monitoring system, building automation system, elevator equipment installation project, garage management system, remote meter reading system, access control system. 3. Project characteristics: ① The construction period is short, and the single floor area of the basement is large; ② There are many professional systems and functions for electrical installation, which require a large amount of pipes to be embedded and a large amount of coordination for on-site cross construction; ④ . There are many supervision and acceptance departments.