Construction organization of water and electricity installation in Jiangsu residential quarters
The building area of this project is 5200m2, a residential building with ten floors and two units. The project is a residential project, mainly including the following sub projects:; Water supply and drainage (water supply system, drainage system, rainwater system, fire protection system), electrical engineering (low-voltage power distribution, lighting system, lightning protection and grounding system), weak current (telephone, television system). Due to the installation of a residential building, the main part of the project cannot be loaded for 48 hours. In the later stage, the amount of installation work is large and the construction period is tight, resulting in the concentration of the installation work in the construction period. Therefore, it is necessary to equip competent construction technicians to organize the construction carefully to ensure high quality, high speed and complete the construction task successfully This document is the construction organization design for water and electricity installation of residential quarters in Jiangsu, 16 pages in total.