Design description: Yes Building function: industrial building Drawing depth: construction drawing Number of drawings: 17 Design time: before 2006 Design content: ventilation, others
Content introduction This document is the preliminary design of the dedusting system of the blast furnace cast house and ore trough of a steel plant, including the detailed design scheme description, comparison of two different schemes and preliminary design drawings. XXXX Ironmaking Plant has transformed the dedusting system of the cast house and ore trough of 1 # and 5 # blast furnaces, so that the dust generated in the production process of the cast house and ore trough system can be effectively controlled and discharged up to the standard, Entrusted by XXXX Iron Making Plant, our institute carried out the scheme design and prepared two sets of schemes for the company leaders' reference in combination with the working conditions, operation system and site layout of 1 # and 5 # blast furnaces. Scheme I: 1 # and 5 # blast furnaces share one set of dedusting system for the casting house, and 1 # and 5 # blast furnace ore slots share one set of dedusting system; Scheme II: 1 # blast furnace cast house and 1 # blast furnace ore trough share a set of dust removal system, and 5 # blast furnace cast house and 5 # blast furnace ore trough share a set of dust removal system. 2 3 4