Beijing Commercial Plaza Construction organization design
Project name, project address, main functions, construction unit, design unit, supervision unit, construction unit, contract number to be determined, contract scope, slope protection, foundation treatment, earthwork, main body, water heating, ventilation and air conditioning, strong and weak current works (excluding power transformation and distribution rooms), pipe laying, threading, rough assembly and repair, contract duration from September 3, 2007 to January 24, 2009, A total of 510 days is planned from September 3, 2007 to January 24, 2009. A total of 510 days is planned. The quality standard of self raised funds ensures the gold medal of the Great Wall Cup for structure, and the completion strives to create the construction scale of the Great Wall Cup. The construction area is 282344 m2, and the underground area is 74000 m2, and the ground area is 208344 m2