This project is the reconstruction and reinforcement of the outpatient complex building of the hospital. It was designed in 1999, and the construction of the main structure was completed at the end of the same year. Uneven settlement of the foundation was found at the beginning of 2000. At the end of 2001, the foundation was reinforced. In 2003, the first to fourth floors were decorated. It was put into use in August 2003. After that, the fifth to sixth floors were simply decorated. In July 2008, it was found that the uneven settlement of the foundation continued to develop, and cracks occurred in the wall and some beam column components. The drawings include: structural transformation, general description of reinforcement design, structural transformation layout plan, roof structure transformation, reinforcement plan, column reinforcement plan, beam bottom reinforcement plan, beam top reinforcement plan, plate bottom structure reinforcement plan, plate top structure reinforcement plan, and stairs node, 30 drawings in total. Structural Transformation Layout Plan Column Reinforcement Plan Slab Bottom Structure Reinforcement Plan Stair Node Beam Bottom Reinforcement Plan