Industrial lead acid waste water treatment Complete set of process drawings
Design description of industrial lead acid wastewater treatment process drawing: type: industrial wastewater treatment station treatment technology: coagulation, filtration, disinfection, Selection of anaerobic process flow: electroplating wastewater design stage: number of construction drawing design drawings: 10-20 sheets; scale: below 10000 tons/day; data catalog; process design description; wastewater treatment process flow diagram; plane positioning diagram; general layout plan; pipeline layout plan; equipment layout plan; equipment list; oil separation tank; regulating tank; process diagram; goldfish viewing tank Process diagram of clean water reservoir First floor plan Roof plan Elevation section diagram Electrical control room Outline drawing Backwater ditch, pipe ditch process diagram Water, electricity and gas distribution point diagram Wastewater treatment station Equipment foundation drawing Sewage pump, sludge pump foundation intermediate pump, backwash pump foundation hidden detailed list>>Content introduction This project is an industrial lead acid wastewater treatment project, The treatment capacity is 40t/h, and the influent index is COD<120mg/L; pb<30mg/L; The treatment process includes lead acid wastewater, oil separation tank, regulating tank, primary PH regulating tank, PAC coagulation reaction tank and secondary PH regulating tank; 18 drawings in total; Drawing List of Comprehensive Workshop Equipment List of Comprehensive Workshop Material List of Comprehensive Workshop Equipment Pipeline Layout Plan of Comprehensive Workshop A-A Profile of Comprehensive Workshop B-B Profile of Comprehensive Workshop D-D, E-E Profile of Comprehensive Workshop C-C, F-F, G-G Profile of Comprehensive Workshop Filter System Diagram of Chlorine Dioxide Dosing Room PAC, PAM dosing system diagram Integrated workshop pipeline support positioning diagram Integrated workshop pipeline support detail hidden detailed list>>Content introduction This project is an industrial wastewater advanced treatment and reuse project in the integrated workshop. The dimensions in the drawing are in mm except for the elevation in meters; The indoor floor elevation is taken as ± 0.000, which is equivalent to the absolute elevation of 30.40m; All steel products in the chlorine dioxide room need additional anti-corrosion treatment outside, and anti-corrosion floor tiles are laid inside the cofferdam; The elbow head of buried pipeline shall be positioned and embedded before the ground is completed.