The project is located in northeast China. The project is usually an underground shopping mall, divided into 25 fire compartments. Each fire compartment is equipped with independent air conditioning and ventilation systems, and air conditioning and ventilation projects. The project uses heat pump water air conditioning systems for refrigeration, and uses thermal storage electric boilers for heating in winter. The air conditioning partitions are equipped with systems, and use a combined air conditioning unit all air system.
The main design scope is the central air conditioning design drawings of the mall
The main drawings include the pipeline plan, system diagram, design description, equipment list and other relevant design drawings of each floor