Construction organization design of a sewage treatment plant with a daily capacity of 50000 tons
2.1 Project introduction: The construction project of a 50000 t/d sewage treatment plant project is located 300 meters west of the south extension of 308 National Road, XX Avenue. The plant covers an area of 5 hectares. After completion, 50000 t/d sewage will be treated. The project is designed by XX Co., Ltd., and the main construction contents of the project include sewage and sludge treatment facilities such as coarse grille and inlet pump room, fine grille and rotational flow grit chamber, aeration tank, dosing treatment room, contact tank, blower room, sludge storage tank, sludge thickening and dewatering room and sludge storage shed, as well as comprehensive office space, distribution substation, boiler room, garage Auxiliary facilities such as machine repair and warehouse, water supply and drainage, roads, etc.