1. Project overview The municipal project of * * Road in Shenzhen is located in the middle of the special zone, in a north-south direction, with a total length of 14.38 kilometers and six lanes in both directions. It is one of the "one horizontal and eight vertical" trunk line networks that Shenzhen will focus on building in the near future. This section is mainly the Liuxian Interchange Project at the intersection of * * Road and Liuxian Avenue, of which * * Road stake number is K4+508.454 ~ K5+640; The stake number of Liuxian Avenue is K9+680 ~ K11+009.113.

 Construction Organization Design of a Highway (Implementation) in Shenzhen - Figure 1

Construction Organization Design of a Highway (Implementation) in Shenzhen - Figure 1

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

  • Shenzhen City Decoration construction organization design of a bid section
    Special discussion meeting system: in case of major problems, the Owner, the Designer, the Supervisor, the General Contractor and relevant subcontractors shall discuss and solve them together. This special discussion meeting shall be held irregularly according to the actual situation.
  • Shenzhen City Construction organization design of an industrial community
    The project includes a six storey office building with a building area of 14651 square meters; Three six storey ordinary dormitory buildings, with a floor area of 22188 square meters; A five storey canteen building with a floor area of 8450 square meters; The total building area is 45289 square meters, with a seven degree seismic design. The office building is a natural foundation, the ordinary dormitory building is a prestressed pipe pile foundation, and the canteen is a manually dug pile foundation.
  • Shenzhen City Construction organization design of an industrial plant
    Building, structure, water supply and drainage, electrical, fire protection and other projects of "Haoshi Pingdi Industrial Plant A, B, fine plant, dormitory 1, dormitory 2, and general plan" designed by Urban Construction Research Institute.
  • Shenzhen City Construction organization design of an industrial park
    Our company has great enthusiasm for the construction of this project and is willing to cooperate with the construction unit. Our company has organized relevant personnel to carefully read the drawings and specially prepared the Construction Organization Design. The Construction Organization Design is a programmatic document for guiding the construction of * * * * * power equipment production base. During the preparation, the construction period, quality objectives, project management organization setting and labor organization, construction schedule control, mechanical equipment and revolving materials allocation, main technical scheme, safety, civilized construction, environmental protection, seasonal construction and many other factors have been fully considered, Highlight its scientificity, applicability and pertinence. Before the implementation of the project, a detailed special construction plan, measures and operation instructions shall be prepared to guide the construction of the project, ensure that all construction contents of the project are completed within the 240 day construction period, and make the project quality reach the one-time acceptance standard, and can be awarded the municipal high-quality project, and strive to create the Golden Bull Award.
  • Shenzhen City Construction organization design of a project
    The first step after the commencement of the project is to organize the construction of positioning double track and earth excavation in advance. According to the relevant technical data on the site and the surrounding environment, according to the construction plan, organize sufficient machinery, equipment and labor to carry out the construction of comprehensive foundation leveling treatment.
  • Shenzhen City Construction organization design for a section of Metro Line 2
    The original landform of the station site is low hills, and some parts are gullies between hills. Containers and bulk warehouses have been built. The overlying Quaternary strata include: artificial rock fill (Qml), late Yanshan intrusive rock (γ 53), medium and slightly weathered coarse grained granite. The thickness of overlying (soil) stone layer is 1.5~4.5m; The groundwater in this section is mainly stored in the gap between the rock fill layers. It is phreatic and has a good water yield property. It is weakly corrosive to the concrete structure, not corrosive to the reinforcement in the concrete structure, and weakly corrosive to the steel structure. The soil layer of the pit wall in the open excavation section is artificial rock fill and medium and slightly weathered rock. The base is slightly weathered rock, and the groundwater level is high, mainly pore phreatic water in artificial rock fill. The engineering geological conditions of this section are good.
  • Shenzhen City Construction organization design of an expressway bid section
    This section is the seventh contract section of XX Expressway, namely, the section from XX to XX Expressway. The design scope is K5+207.1~K8+300, with a length of 3. XX3 km. This section is an urban section, which shares the same line with the existing XX Road. XX Expressway is a viaduct, and XX viaduct is arranged in the current main lane.
  • Shenzhen City Construction organization design of a municipal project
    The municipal project of the North Passage of XX District is located in the central city of XX District of XX City, starting from XX Expressway in the west and ending at XX Highway in the east, with a total length of 13.318km. It is an urban expressway in the northwest of XX District. The construction of this project will improve the urban development layout of XX City; Promote the healthy and coordinated development of regional economy; It is of great significance to improve the planning of high-grade trunk line network in XX City and divert the inbound and outbound traffic flow of other trunk lines.
  • Shenzhen City Construction organization design of a small spacing tunnel project
    The tunnel (K16+385 ~ K16+525) is located in Shenzhen. The tunnel is a short tunnel with a total length of 140m and a small spacing of left and right parallel tunnels. Both the left and right tunnels are located on a straight line, without superelevation. The longitudinal gradient of the left and right tunnel roads is 1.862%. Since the line at the tunnel portal section is perpendicular to the topographic contour line, the slope of the mountain at the tunnel entrance and exit sections is gentle, and the portal is "bamboo cut" to ensure overall coordination and beauty. The (pedestrian) tunnel (R0+020 ~ R0+195) is built next to the (vehicular) tunnel, with a total length of 175 m. The tunnel meets the requirements of pedestrian traffic and also allows various pipelines to pass underneath. The entrance of the pedestrian tunnel adopts the "bamboo cutting type" portal, and the exit is located at the scarp and the mountain slope is large, so the end wall portal is adopted.
  • Shenzhen City Construction organization design of a small spacing tunnel project
    Construction Organization Design of a Small Spacing Tunnel Project (Implementation) in Shenzhen Construction Organization Design of a Small Spacing Tunnel Project (Implementation) in Shenzhen
  • Construction organization design of a highway bridge project (implementation) in Shenzhen

    This project is the Yantian Port Branch Project of Shenzhen * * Expressway, an important part of Shenzhen's road network, and a key construction project in Shenzhen. The project is located in the southeast of Shenzhen. The route is roughly north-south, starting from Yantian Port in the south, passing through Yantian and Zhengkeng tunnels in the northwest along the planned Wutong Mountain Avenue, passing through the west side of Xikeng, crossing 205 National Highway, west side of Shenkeng Village, and crossing Shuiguan Expressway, and ending at Paibang Flyover of * * Highway in the north, connecting with the planned Dongguan Boshen Expressway.  

  • Shenzhen City Construction organization design of highway and railway overpass (implementation) in a bid section 3 of Shuiguan Expressway Expansion Project
    Shenzhen Shuiguan Expressway is located in the southwest of xx District, Shenzhen, with east-west route. It is the main channel for east-west fast passenger and freight transportation in Shenzhen. This expansion starts from the xx interchange at the intersection of xx expressway, xx road and xx expressway in the west; To the east is xx New Town in xx District, connected with xx Avenue, with a total length of 13.465km. This contract section is the xx contract section of Shenzhen Shuiguan Expressway Expansion Project. The construction mileage is K4+500 ~ K5+300 and K9+500 ~ K10+300. There are four overpass bridges in this section, two large and two medium bridges.
  • Shenzhen City Construction organization design (word format) of an expressway bid section (implementation)
    This section is the seventh contract section of XX Expressway, namely, the section from XX to XX Expressway. The design scope is K5+207.1~K8+300, with a length of 3. XX3 km. This section is an urban section, which shares the same line with the existing XX Road. XX Expressway is a viaduct, and XX viaduct is arranged in the current main lane. The construction scope of this section is as follows: XX viaduct construction project (1332.1m long), XX road ground system reconstruction project, XX road reconstruction project, XX overpass construction project, temporary road under Shuiguan Expressway, two pedestrian overpasses, municipal pipeline project (water supply, drainage, power, communication, lighting, gas) and drainage structure project.
  • Shenzhen City Construction organization design of a municipal project (implementation) (word format)
    The municipal project of the North Passage of XX District is located in the central city of XX District of XX City, starting from XX Expressway in the west and ending at XX Highway in the east, with a total length of 13.318km. It is an urban expressway in the northwest of XX District. The construction of this project will improve the urban development layout of XX City; Promote the healthy and coordinated development of regional economy; It is of great significance to improve the planning of high-grade trunk line network in XX City and divert the inbound and outbound traffic flow of other trunk lines. The second bid section of the second contract section of the project (hereinafter referred to as this bid section) undertaken by our company starts from K9+860 to K13+338. The route is generally east-west, with a total length of 3.478km.
  • Shenzhen City Construction organization design of a high-rise commercial building
    Shenzhen XX Business Center Project is located in the central district of * *, Shenzhen, and is in the golden business district of the "Guide to Urban Planning and Design". This project is a super high-rise civil building integrating office and commerce. It has 50 floors above the ground and is equipped with a refuge floor and a helipad at the top of the floor according to the specifications. Podium part: the podium on the south side has 3 floors, the podium on the east side has 4 floors, and the basement has 3 floors in total, which is used as garage and equipment room. The underground three floors are used as civil air defense basement in wartime. The project belongs to Class I super high-rise civil building. The fire resistance rating of the building (including the basement) is Class I, the fire resistance rating of the underground garage is Class I, the fire resistance rating of the podium is Class II, and the building durability is Class I. The total building area of Shenzhen XX Business Center is 120000m2, including 20703m2 of the three floor basement. The height of the building is 218m, the height of the refuge floor and the standard floor is 3.9m, and the height of the first to fourth floors of the podium building is 6m, 4.8m, 4.8m, and 5m respectively. There is no structural transfer floor. ± 0.00 is equivalent to an absolute elevation of 7m. This project is designed by Shenzhen XXX Architecture and Engineering Design Institute, invested by XXX Real Estate Development (Shenzhen) Co., Ltd., and supervised by XXX Supervision Company. The exterior wall decoration of this project mainly adopts glass curtain wall, dry hanging granite and composite aluminum plate, and a small amount of paint on the exterior wall.
  • Shenzhen City Construction organization design of high-rise building demolition in a power plant
    This project is a complete set of LNG gasification devices of *************** Co., Ltd., which will be completely removed and transported to * * Power Co., Ltd. for process installation, including the removal, transportation, installation and commissioning of LNG gasification station.
  • Shenzhen City Construction organization design of a high-rise university apartment
    Project overview Project name Location of Phase I of Southwest Student Apartment of Shenzhen University Parcel No. Land unit of Southwest Campus of Shenzhen University Main technical and economic indicators of land for Shenzhen University Total land area (m2) 23923.7 Construction land area (m2) 19097.7 Total building area (m2) 55345 Green land area (m2) 10143.3 Ground building area (m2) 50297 Floor area ratio (%) 2.1 Underground building area (m2) 5048 coverage rate (%) 25.3% Building base area (m2) 6046.4 Green space rate (%) 42.4% Road square land area 7734 Parking spaces (above ground/underground) 50 This construction is Phase I (Building 1) Total building area (m2) 24501.1 Above ground building area (m2) 22199.7 Underground building area (m2) 2301.4 Main characteristics of the building Building nature Dormitory building scale 528 Dormitories Number of floors (underground/underground) 12 floors/1 floor Building height 46.280 m Design service life 50 years Structure type Frame shear wall structure Building category II High rise seismic fortification intensity seven degrees Fire resistance rating Ground level II/basement level I Civil air defense engineering class A, normal six, Building area and total allocated building area of Grade VI second-class personnel shelter (m2) 24501.1 Building area and allocation based on floor area ratio (m2) 22199.7 Among them, the specified building area (m2) 1. Dormitory area 22199.7 22199.7 2. Approved increased building area (m2) Bonus building area (m2) Excluding floor area and allocation based on floor area ratio (m2) 2301.4, of which the area of the civil air defense basement (m2) 1730, the area of the underground equipment room (m2) 571.4, the reduced building area (m2)
  • Shenzhen City Construction organization design of a high-rise residential building
    Total land area: 27806.61 m2 Total building area: 125062.74 m2 (including the building area of the basement: 38896.19 m2) Underground part: two floors of the basement of the project, with a building area of 38896.19, used for garage and equipment room. Above ground part: six towers with 17~32 floors, used for shops and residential buildings; Building 8 # is for municipal use. Building area distribution and overview of each sub item: 1 # building: building area 12259.46 m2, 32 floors in total, total height 99.30 m 2 # building: building area 11959.02 m2, 32 floors in total, total height 99.30 m 3 # building: building area 14273.79 m2, 32 floors in total, total height 99.30 m 5 # building: building area 12002.04 m2, 32 floors in total, total height 99.30 m 6 # building: building area 20104.13 m2, 25 floors in total, Total height 78.30m 7 # building: building area 15318.11 m2, 17 floors in total, total height 51.80m 8 # building: building area 250 m2, 1 floor in total, total height 2.90m
  • Shenzhen City Construction organization design of foundation pit of a building
    The project is located at the intersection of zz road and zz road. The north side of the site is xx road, and the south side is xx residential area, which belongs to a prosperous urban area. The design unit of the proposed xx Business Building is xx Engineering Design Co., Ltd., and the project land area is 8000m2. The main body of the building consists of an 18 storey commercial hotel and a 21 storey office building with a 2-storey basement. The main structure of the building seems to be a reinforced concrete frame structure. The shape of the foundation pit is similar to the letter "L". The excavation depth of the foundation pit is about 8.0~18.0m, the excavation bottom area of the foundation pit is about 7221.2m2, and the perimeter of the foundation pit bottom is about 466.1m.
  • Shenzhen City Construction organization design of reclamation project
    This data is the construction organization design of Shenzhen reclamation project, which is detailed and can be used for reference.
  • Shenzhen City Construction organization design of decoration project in a bid section
    1. Quality management objective: to ensure qualified project standards and strive for high-quality model projects in Shenzhen. 2. Construction period management objective: the total construction period is 100 calendar days. Safety management objective: the rate of major safety accidents is 0, and the rate of minor injury accidents is less than 3.0 ‰.
  • Shenzhen City Sea reclamation construction organization design scheme
    We hereby invite our senior engineer with rich experience in soft foundation treatment to act as a consultant, and another senior engineer with deep research on earth rock compaction to participate in the construction of subbase of this project.
  • Shenzhen City Detailed construction organization design of reclamation project
    The project is located in the south of the three major scenic spots in Shenzhen, starting from Qiaocheng Road in the east, Shahe East Road in the west, Binhai Avenue in the south, and Baishizhou Road in the north, with a total land area of 288.5 hectares. Phase I project has been completed, and our bidding scope is Phase II project area V in the middle of the site, that is, Baishizhou South, section road here, and between No. 6 Road and No. 7 Road.
  • some Shenzhen City Construction organization design of reclamation project
    Bidding Documents for Construction of Shenzhen Bay Reclamation Area Soft Ground Treatment (Phase II) Project of Shenzhen Land Investment and Development Center (including Supplementary Notice No. 001 and 002).
  • Shenzhen City Complete construction organization design of reclamation project
    The project is located in the south of the three major scenic spots in Shenzhen, starting from Qiaocheng Road in the east, Shahe East Road in the west, Binhai Avenue in the south, and Baishizhou Road in the north, with a total land area of 288.5 hectares. Phase I project has been completed, and our bidding scope is Phase II project area V in the middle of the site, that is, Baishizhou South, section road here, and between No. 6 Road and No. 7 Road. The work scope of this section is 8m within the red line of the surrounding roads, with a processing area of 138020.9m2. This site belongs to the bay intertidal zone and marine plain. The original elevation of Haiti is between 0.7 and -2.9, lower than the average elevation of the sea surface. The area is evenly distributed with 5-7m thick sludge. The geological conditions are complex. Its main geological characteristics are: there is no marine alluvial muddy sand layer above the Quaternary marine sludge layer, and there is Quaternary eluvium below the sludge layer. The site is located in the subtropical region, with an average temperature of 22 ℃, a multi-year relative humidity of 79%, and an average rainfall of 1920mm. The rainy season is mainly from April to September.
  • Shenzhen City Construction Organization Design of Zhubo Project
    Zhonghaoyuan New Town is located in the east of Zhonghang Road, Futian District, Shenzhen, and north of Jiahe Huaqiang Building. It covers an area of 8000.7 m2, with a total construction area of 65737.48 m2 (including 56061.98 m2 for residential buildings and 9075.5 m2 for shopping malls), and a basement construction area of 11722.57 m2. The project is divided into two towers, A and B, with a total height of 90.1m and 32 floors.
  • Construction organization design of a highway bridge project in Shenzhen
    1、 Project overview (I). Project introduction This project is the xx branch line project of xx expressway in xx city. It is an important part of xx city's road network and a key construction project in xx city. The project is located in the southeast of xx city. The route is roughly south-north, starting from xx in the south. Along the planned Wutong Mountain Avenue, it runs northwest through Yantian and Zhengkeng tunnels, crosses Wutong Mountain, passes the west side of Xikeng, crosses 205 National Highway, the west side of Shenkeng Village, and crosses Shuiguan Expressway, and ends at Paibang Flyover of xx Highway in the north, connecting with the planned Dongguan Boshen Expressway. The contract section is composed of two bridges, namely XX Bridge and Liantang Viaduct. The bridge site of xx Bridge is located between K9+168 and K9+298 of xx branch line of xx Expressway. The general layout of the bridge opening is 4 × 30m box girder structure, and the superstructure is fabricated prestressed concrete continuous box girder. The total length of the whole bridge is 130.648m. The substructure adopts column pier, rib abutment and column abutment; The foundation is pile foundation. The transverse bridge deck of the bridge is 32m wide and divided into two parts, the left part is 128.193m long and the right part is 130.648m long. Liantang viaduct is located between K9+713-K10+151 of xx branch line of xx expressway. The general layout of the bridge opening is 14 × 30m box girder structure, and the superstructure is fabricated prestressed concrete continuous box girder. The total length of the bridge is 437.395m. The substructure adopts column pier and rib abutment; The foundation is pile foundation. The transverse bridge deck of the bridge is 32m wide and divided into two parts, the left part is 437.395m long and the right part is 428.203m long. The whole bridge of xx Bridge is located on the circular curve with R=800 m, while Liantang Viaduct K9+722 to K9+810 is located on the transition curve, and K9+810 ~ K10+151 is located on the circular curve with R=750 m. The superstructure beams of the two bridges in the contract section are 30m post tensioned prestressed concrete continuous box girders. The bridge is divided into two pairs horizontally, and five pieces are arranged in a single transverse direction. The top plate of the box girder is 17-25 cm thick, the web is 18 cm thick, and the bottom plate is also 18 cm thick. A fillet section with R=5 cm is set at the junction of the web and the bottom plate. Due to the demand of route alignment, 2% single slope is set at the top of precast box girder, and the height of box girder is about 1.60m; The cantilever length of side span side beam is about 1m, and that of mid span cantilever is about 80cm; For this reason, the thickness of the cantilever varies with the different positions where the box girder is used, with the thickest part being 27cm and the thinnest part being 18cm; Post tensioning construction of prestressed steel tendons shall be arranged in the longitudinal positive bending moment and negative bending moment sections respectively to meet the requirements of structural stress. The lower structure of the bridge is also symmetrically arranged in two pieces. The bent cap is a cantilever double column pier frame, which is an ordinary reinforced concrete structure. Pier columns with diameters of φ 1.6 and φ 1.8 meters are supported on piles with diameters of φ 1.8 and φ 2.0 meters. Tie beams are not set for those with good geological conditions between pier columns and piles. Tie beams are set for those with poor geological conditions and high pier shafts, which are consolidated with piles and piers cast in situ. A 5.4-10.2cm thick concrete leveling layer is set on the top of the deck box girder, guardrails are set on the left and right sides of the bridge, and expansion joints are set at corresponding parts of the structure.
  • Shenzhen City Construction organization design for the implementation of highway railway overpass in Bid Section 3 of Shuiguan Expressway Expansion Project
    Shenzhen Shuiguan Expressway is located in the southwest of xx District, Shenzhen, with east-west route. It is the main channel for east-west fast passenger and freight transportation in Shenzhen. This expansion starts from the xx interchange at the intersection of xx expressway, xx road and xx expressway in the west; To the east is xx New Town in xx District, connected with xx Avenue, with a total length of 13.465km.
  • Shenzhen City Bid construction organization design for a bid section of eastern coastal expressway
    2 Project overview 2.1 Project introduction xx expressway is located in the east of xx urban area, connecting Luohu District, Yantian District and the east of xx. It is the second fast passage from xx to xx. The project is the Liantang Yantian section of the passage, which starts at 4 kilometers of Luosha Highway to the east of Luofang Interchange, and ends at the junction of Yantian Port and Yanba Expressway. The route starts at LZK0+000~K11+283.566, The total length is 11.566km, with 2 interchanges (i.e. the upper and lower Enshangdao and Wutongshan Beishan interchanges), 6 and 4 bridges. The 8th section is mainly tunnel, which is designed as a separate repair, with the spacing between left and right tracks being 50~33.93m. At present, 8 vehicles have been built in Section A and Section B of Yanba Expressway from the east of Yantian to Huizhou, and Section C has also entered the implementation stage. Therefore, the construction of this project is extremely urgent. Xx tunnel is the longest tunnel of the project, and the mileage of the 8th bid section is: ZK6+665~ZK8+071 (1406m long), YK6+720~YK8+094 (1374m long), mainly consisting of two tunnels and one transverse tunnel. Asphalt concrete pavement, separation tunnel 2 × 14m, six lanes, design speed of 80km/h.
  • Shenzhen City Construction organization design of a key municipal project (implementation) in Longgang District
    The north passage of xx district in xx city is located in the central city of xx, starting from xx expressway in the west and ending at xx highway in the east, with a total length of 13.318km. It is an urban expressway in the northwest of xx city. The whole line is divided into two contract sections, the contract section I is from the starting point to xx interchange, and the contract section II is from xx to xx highway. This project is the first bid section (K6+300 ~ K9+860 section) of contract section II of xx municipal works in xx district; It includes four overpasses (Huangge Overpass, Aixin Overpass, Huilong Overpass, Youyi Overpass) and one pedestrian bridge (Youyi Overpass). The total length is 3560 meters, the width of the road red line is 80 meters, the main line is two-way six lane, and auxiliary roads are set on both sides of some sections.
  • Shenzhen City Construction organization design of an outdoor pipe network project
    1. Project name: Shenzhen xxx Outdoor Pipe Network and Road Project. 2. The project site is located in the west of the artificial lake in the original living area. 3. Construction schedule requirements: the estimated commencement date: October 25, 2007 Completion date: January 20, 2008 The total construction period is 88 calendar days. 4. Main works: outdoor water supply and drainage pipe network, outdoor low-voltage distribution lines, cable trenches, outdoor roads, sidewalks, outdoor lighting and its lines, distribution box installation, etc. within the scope of the construction drawing of the new management living area.
  • Shenzhen City Construction organization design of a section of a reservoir sewage interception project
    Content introduction 1.1. Construction survey and construction monitoring 1.1.1. During construction survey, strictly follow the provisions of Code for Engineering Survey (GB50026-93) to ensure the survey accuracy. Leveling is adopted for elevation measurement of section tunnel. It is transmitted from the elevation control points outside the tunnel. A pair of elevation control points are set every 200~300m inside the tunnel. The traverse baseline control points are used as elevation control points for round trip observation. The observation tolerance and accuracy meet the specified level of accuracy. 1、 Ground control survey (1) Horizontal control survey shall resurvey the GPS control points provided and conduct joint survey with adjacent sections. The total station is used for the ground precision traverse network control survey. The mean square error of angle measurement is ≤± 2.5 ″, the mean square error of the weakest point is ≤± 15mm, the mean square error of the relative point of adjacent points is ≤± 8mm, and the total length closure error of the traverse is ≤ 1/40000. (2) The elevation control survey shall resurvey the Class II benchmark provided and conduct joint survey with the adjacent benchmark. Use precision level and ruler to densify the leveling network between Class II benchmarks, lay closed loop lines with the closure error ≤± 8 mm (L is the length of the loop line, calculated in kilometers), and the accuracy index of the operation method shall comply with the requirements of Class II benchmark survey. (3) For elevation transmission, densified leveling network is used for approach leveling, which is measured according to Class II leveling methods and instruments, with a tolerance of ≤± 8 mm, and Class II leveling operation is also used for open excavation section and tunnel section connected with open excavation section. The calibrated steel ruler is used to transfer the elevation through the construction shaft by hanging. Two levels above and below the shaft are used to observe the readings at the same time. The steel ruler is staggered for 3cm~5cm each time, and the height difference error is controlled within ± 5mm, and the average value is taken for use. Underground elevation transmission and coordinate transmission are carried out simultaneously. 2、 Control survey in the tunnel (1) The control survey of traverse in the tunnel lays out the basic traverse of traverse in the tunnel. The side length of the straight section is ≥ 120m, and the side length of the curve section is 50-60m. Points are set at both the left and right line construction channels and connecting channels. The conductor point shall be buried with concrete markstone, which shall be made into a 120mm × 120mm × 10mm steel plate block with a diameter of 2mm and a copper wire with a depth of 6mm, and then surrounded with concrete into a square markstone. Secure steel sheet piles and copper core signs shall be embedded at the starting end of the underground conductor, and nuts shall be set on the pile corners as elevation points, one pile for two purposes. The traverse survey in the tunnel shall be carried out according to the requirements of grade I traverse accuracy, the mean square error of angle measurement shall be ≤± 5 seconds, and the closure error of the full length of the traverse shall be ≤ 1/14000. Excavate to about 50m before the tunnel penetration, and retest the underground conductors according to the requirements of Class I conductor accuracy to ensure the penetration accuracy. (2) Vertical control survey in the tunnel The leveling point and traverse point in the tunnel are set together, and Class II leveling methods and instruments are used for survey. The discrepancy and closure tolerance are ≤± 8 mm, and the excavation is about 50 m before the tunnel penetration. The underground traverse is retested according to Class II leveling accuracy requirements to ensure the penetration accuracy. 3、 Construction survey The daily construction survey in the tunnel is in the charge of the operation team. The construction traverse is set by using the traverse control points in the tunnel. The side length of the construction traverse is 30-50m. The elevation points used for construction in the tunnel shall be densified according to the elevation control points set in the tunnel and closed to the elevation control points. The central line and elevation shall be transferred to the excavation face in time, and the excavation contour line shall be drawn. After excavation, the section record shall be made. Before the initial support and secondary lining, the central line elevation stake points shall be handed over. After the lining trolley is in place or the formwork is erected, the retest shall be carried out, and the pump shall be started for grouting after the accuracy is confirmed. 4、 Tunnel breakthrough error measurement Plane breakthrough measurement: at the tunnel breakthrough surface, coordinate method is used to measure the coordinate difference of the breakthrough point from both ends (one end is the adjacent bid section), and it is reduced to the reserved section and centerline to obtain the horizontal breakthrough error and longitudinal breakthrough error. Elevation penetration survey: use a level to measure the elevation of the penetration point from both ends of the penetration surface (one end is the adjacent section), and the error is the vertical penetration error.
  • Shenzhen City Construction organization design of a bid section of a water supply and storage project
    Content introduction 1.1 Project overview 1.1.1 Project overview xx water supply regulation and storage project is located in the upper reaches of Maozhou River in Shenzhen, across xx and Guangming sub district offices. The project consists of four parts: xx reservoir expansion project, overseas water source connection project (i.e., the connection project from the Ejing Reservoir to xx Reservoir), water supply transmission and distribution project (i.e., the interconnection project with Shiyan Reservoir) and rainwater and flood utilization project. Among them, xx Reservoir Expansion Project is a large-scale water supply regulation and storage project based on the expansion of xx's original three small reservoirs, namely Hengjiang Reservoir, Shitouhu Reservoir and Guangming Jingkou Reservoir. The reservoir dam site is located 350 m downstream of the current Hengjiang Reservoir, with a controlled rainwater collection area of 11.77 km2. Its scale is based on Shenzhen's water source reserve demand, terrain conditions, water source conditions, economy After comprehensive consideration of soil reserve and other aspects, the normal water level is finally determined as 59.7m, and the corresponding normal storage capacity is 142 million m3. The main buildings are composed of six dams, spillway and drainage tunnel. The total length of the dam is 4.39km, the maximum dam height is 54m, and the water surface area of the reservoir area is 6.0km2. The connecting tunnel from Ejing Reservoir to xx Reservoir is basically arranged along the ridge between the two reservoirs, with a total length of 4.64km; The total length of the water supply project from xx reservoir to Shiyan reservoir is 6.4 km, most of which are tunnels. The water conveyance scale of the connecting tunnel and the water conveyance tunnel is 1.365 million m3/d and 0.885 million m3/d respectively, and the corresponding tunnel diameters are 3.6m and 3.4m respectively. Rainwater and flood utilization project: the existing Baihua water lifting project will be reconstructed to increase the capacity of its regulation and storage tank and increase its water yield. 1.1.2 The main buildings of bid section x within the scope of this bid section include No. 4 dam, water release tunnel and its inlet and outlet buildings, the secondary buildings are No. 1 highway and No. 5 highway, the temporary works include 14 temporary roads, diversion channels and construction cofferdams, in addition, the dam crest and road lamp electrical works and water and soil conservation works. The dam crest is 63.5m high and 8m wide. The dam type is an earth rock dam with clay core. The total length of the dam crest is 1121m, the maximum dam height is 50.7m, and the maximum bottom width is about 280m. The core wall of the dam is made of completely weathered soil, the upstream and downstream dam shells are made of strongly weathered soil and stone, and the core wall and dam shell are made of sand filter and transition. The upstream slope ratio of the dam is 1:3, and the downstream dam slope is provided with a 2.0m wide berm at an elevation of 45m. The slope ratio above the berm is 1:2.5, and that below the berm is 1:2.75. The upstream slope protection adopts cast-in-place C20 concrete with a thickness of 250mm. The water release tunnel is arranged at the foot of Damashan Mountain between No. 4 and No. 5 dams, with a length of 423m. The water release tunnel is also used for venting, water supply and diversion. It is comprehensively considered that the tunnel is a round pressure tunnel, with an inner diameter of 3m.
  • Shenzhen City Construction organization design scheme of reclamation project
    The project is located in the south of the three major scenic spots in Shenzhen, starting from Qiaocheng Road in the east, Shahe East Road in the west, Binhai Avenue in the south, and Baishizhou Road in the north, with a total land area of 288.5 hectares. Phase I project has been completed, and our bidding scope is Phase II project area V in the middle of the site, that is, Baishizhou South, section road here, and between No. 6 Road and No. 7 Road. The work scope of this section is 8m within the red line of the surrounding roads, with a processing area of 138020.9m2.
  • Shenzhen City Decoration construction organization design scheme of a bid section
    Special discussion meeting system: in case of major problems, the Owner, the Designer, the Supervisor, the General Contractor and relevant subcontractors shall discuss and solve them together. This special discussion meeting shall be held irregularly according to the actual situation.
  • Shenzhen City Detailed construction organization design of a decoration project
    The business group consists of the material group and the labor and material measurement group. The material team consists of a buyer, a material review clerk and a warehouse keeper, who are respectively responsible for the material purchase, review, receiving and dispatching of the project. The quantity measurement group has two quantity surveyors. The construction team has two chief construction foremen and one electromechanical foreman, who are respectively responsible for the fine decoration construction management of 2 # and 3 # scientific research buildings and the electromechanical installation within the fine decoration scope of the two buildings.
  • Shenzhen City Construction organization design of a building project
    The project is located at the intersection of Bao'an South Road and Jiabin Road in * * District, Shenzhen, and the east side is the Jiabin Garden Residence. The total land area is 5529.1m2, and the total building area is 60202.9 m2, including 13794 square meters underground, 48655 square meters above the ground, 3 floors underground, 29 floors above the ground, and the building height is 99 meters. The roof is a steel structure arc roof. The project adopts manual hole digging pile, and the main building pile uses slightly weathered rock as the pile end bearing stratum.
  • Shenzhen City Construction organization design of an industrial park
    ********All buildings, earthwork excavation and all outward transportation, pile foundation, main structure, water supply and drainage, strong and weak current installation (all contents of the drawing from the outgoing line of the low-voltage distribution cabinet for strong current), electrical pipeline connection works, and all reservations and embedments included in the bidding drawings of the industrial park project are all contents included in the bidding drawings.
Click to see more
All comments I want to comment
No comment