Uploaded on: 12:00:00, January 29, 2019 come from: Water supply and drainage / Water supply and drainage construction design / construction plan
zero
4 points

Due to the low potential of the prefabrication site, after the surface soil is removed, 30 cm thick C30 concrete will be poured in place and compacted. Then 10 pieces of C30 concrete with the size of 0.8 × 0.6 × 86 m will be poured as the support beam. 10 m at both ends will be the foundation of the whole reinforced concrete slab. The two support beams will be backfilled with lime soil, compacted and poured with 20 cm thick C30 concrete. The surface will be leveled with the support beam as the foundation of the bottom formwork of the girder, Two rows of iron plates are embedded on the bottom formwork foundation and the whole plate foundation to weld the bottom formwork channel steel and side formwork support screws. Use 6.3 # channel steel to level the embedded iron plate, then pour 8cm concrete in the middle, and pave 6mm steel plate as the bottom formwork of the girder. The steel plate is welded by groove welding mill

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment