Design description: Yes, building function: industrial building, height category: multi-storey building, built-up area: 4000㎡, Number of floors above ground: 4th floor, drawing depth: construction drawing, Number of sheets: 13 sheets, design content: clean, cleanliness level: 10000
Content introduction Electrical drawing of air conditioning for purification and decoration of electronic factory 1. Project overview and design scope of this discipline: this project is located in Zhongshan City, with a building area of about 4000m2, and a total of 4 floors. This design is a purification system for the first floor workshop, including purification and decoration. The purification area of the workshop is about 500m2, the net height in the ceiling is 2.5m, and it is designed as a 10K clean room. 3、 Engineering design description 1. Design scope: the design content is the air conditioning decoration engineering design of the first floor clean room. 2. Selection of cold source: water cooled clean air conditioner cabinet is used 4、 Purification system design: 4.1. Air flow pattern of the clean room: non unidirectional flow is adopted, and the air flow organization is the way of sending up the shaft and returning down. 4.2 The purification system process is as follows: 2 3 4