Uploaded on: 2018-10-25 14:00:01 come from: Environmental protection data / Domestic sewage treatment drawing / Other process drawings
zero
4 points

This design is the process design of Ningxia xxxxx gas boiler room. The heat medium parameter of the primary network is 95/70C. The heat medium parameter of the secondary network is 75/60C. This design uses three M241 9300KW gas high-temperature hot water boilers Pipe material: water pipe, soft water pipe shall be galvanized steel pipe, drainage pipe shall be cast iron pipe, and other pipes shall be welded steel pipe Pipeline connection: the pipeline, equipment and accessories are connected by flange and internal thread, and the rest are welded by manual arc welding, welding rod is knot 422, and drainage pipe is asbestos cement interface

 [Ningxia] Gas boiler room process design cad drawing - Figure 1

[Ningxia] Gas boiler room process design cad drawing - Figure 1

 [Ningxia] Gas boiler room process design cad drawing - Figure 2

[Ningxia] Gas boiler room process design cad drawing - Figure 2

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment