1. This building is the B building of Balihu Park Service Area (Phase III), with 5 floors above the ground and a building area of about 9100 square meters.
2. Installation instructions of water system air conditioning and ventilation engineering, air conditioning design, fluorine system construction instructions, air conditioning and ventilation legend, material and equipment list, first floor air conditioning system plan, second floor air conditioning system plan, third floor air conditioning system plan, fourth floor air conditioning system plan, fifth floor air conditioning system plan, second floor air conditioning water system plan Air conditioning water system plan on the third floor, air conditioning water system plan on the fourth floor, air conditioning water system plan on the fifth floor, air conditioning fluorine system plan on the first floor, air conditioning water system riser 1~air conditioning water system riser 4, expansion water tank connection plan.