Uploaded on: 2018-05-15 22:42:31 come from: Architectural design / Industrial buildings / Industrial plant
zero
5 points

Content introduction: a single-layer steel structure workshop drawing The whole factory building is single story, and some parts are two stories. The span of the factory building is 38 meters, and the column spacing is 6 meters. There are 22 drawings in total, mainly including: foundation layout plan, embedded bolt layout plan, bottom floor steel column layout plan, bottom floor roof steel frame beam and rigid tie bar layout plan, bottom floor roof support layout plan, bottom floor roof steel purlin, second floor roof support layout plan, column support layout plan, etc.

 Structural drawing of a steel structure workshop - Figure 1

Structural drawing of a steel structure workshop - Figure 1

 Structural drawing of a steel structure workshop - Figure 2

Structural drawing of a steel structure workshop - Figure 2

 Structural drawing of a steel structure workshop - Figure 3

Structural drawing of a steel structure workshop - Figure 3

 Structural drawing of a steel structure workshop - Figure 4

Structural drawing of a steel structure workshop - Figure 4

 Structural drawing of a steel structure workshop - Figure 5

Structural drawing of a steel structure workshop - Figure 5

 Structural drawing of a steel structure workshop - Figure 6

Structural drawing of a steel structure workshop - Figure 6

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment