Detailed construction organization design of a new campus project
The leveling of the construction land has been completed, and the ground elevation is between 21.5 and 22.5 m. The engineering geological conditions are good, the total construction land is 108.4ha, and the total construction area is about 360000m2. In this phase, 16 various teaching buildings, administrative buildings, experimental buildings, libraries and experimental plants will be constructed, with a floor area of 169293m2 (budget). Except for the single storey workshop of the experimental plant, which is an 18m double span bent structure, the rest are all cast-in-place reinforced concrete frame structures.