Construction Organization Design of National Scenic Area
Once we receive the letter of acceptance, we will immediately start construction preparation and try to complete most of the work that can be carried out in advance before the commencement. Once the project starts, manpower, material resources and machinery can be put into the project construction, so that the project can enter the normal construction and ensure the smooth and rapid progress of the project. We will complete the following preparations. 1. Site preparation (1) Build light steel activity houses as temporary offices and migrant workers' dormitories. According to the general construction layout of the project, improve the water and electricity interface points provided by the owner and connect them to the on-site installation of water and electricity meters to solve the temporary water and electricity consumption. (2) The site survey and positioning shall be carried out together with the Owner and the Supervisor according to the general plan, design and construction drawings and the control points provided by the Owner. After the owner asks the relevant departments to make a fixed point, the owner, supervisor and on-site review and acceptance will be invited. After the acceptance, establish the construction axis control and elevation control.