The air conditioning, ventilation and dust removal scheme of the pre treatment workshop in front of the Chinese medicine factory is very detailed in the drawing design, including the support and lifting of the air duct, the air duct inspection hole, the pipe through the wall, the installation of the roof waterproof casing, the selection and installation of the smoke control system, the installation of the ventilator accessories, the selection and installation of the air valve, etc., for everyone to download and reference.
Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!
Collection
share
WeChat code scanning and sharing
Click to share