Supervision outline of a high-rise office building in Zhejiang
2. Contents, Basis, Scope and Objectives of the Project Supervision 2.1 Contents of the Project Construction Supervision mainly includes the control of the investment, construction period, quality and safety of the project construction, the management of the project construction contract and information, and the coordination of the working relationship between the Employer and the parties concerned in the project construction. 2.1.1 Construction preparation stage 1) Review the qualification of subcontractors selected by the Contractor; 2) Supervise and inspect the contractor's quality assurance system and safety technical measures, and improve the quality management procedures and systems; 3) Check whether the design documents meet the design specifications and standards, and whether the construction drawings meet the construction needs; 4) Participate in the technical disclosure from the design unit to the contractor; 5) Review the construction organization design submitted by the Contractor, focus on the organization of construction scheme, labor, materials, mechanical equipment and measures to ensure project quality, safety, construction period and cost control, and put forward supervision opinions to the Owner; 6) Before the commencement of unit works, check the Contractor's resurvey data, especially whether the survey data and control piles between two adjacent construction units are handed over clearly, whether the procedures are complete, whether there are quality problems, and review the location and fixing of positioning control points and leveling control points; 7) Recheck the central line and horizontal control of key parts of the project; 8) Supervise the implementation of various contracting conditions, approve the commencement report of unit project, and report to the owner for reference.