Construction design scheme of frame shear wall high-rise multi-function office building
(19) Technical Specification for Steel Frame Plywood Formwork (JGJ96-95), (20) Quality Standard and Inspection Method for Gravel or Pebble for Ordinary Concrete (JGJ53-92) (21), Sampling Method for Welded Joints and Mechanical Properties Test (GB2649-89) (22), Standard for Test Methods of Concrete Structures (GB50152-92) (23), Specification for Design and Construction of Reinforced Concrete Tall Buildings (JGJ3-91) (24) Technical Specification for Concrete Pumping Construction (JGJ/T10-95) (25), Code for Construction and Acceptance of Building Ground Engineering (GB50209-95) (26), Code for Engineering Survey and Technical Description (GB50026-93) (27), Standard for Basic Terms of Engineering Survey (GB50228-96) (28), Technical Specification for Engineering Network Planning (JGJ/T1001-91) (29), Code for Safety in Use of Construction Machinery (JGJ33-86) (30) Technical Code for Safety of Working at Heights in Building Construction (JGJ80-91) (31), Safety Regulations for Tower Cranes (GB5144-94) (32), Safety Code for Power Supply and Utilization at Construction Site of Building Engineering (GB50194-93) (33), Technical Operation Regulations for Construction of Building Installation Engineering (local standard of xx Province DB21/900.1~23-96). III. Preparation description: this project is a typical "trilateral project", The construction organization design currently prepared is based on the construction drawings and preliminary design drawings of the basement and podium provided by the owner, so this construction organization design is only used as a macro guiding technical document for engineering construction and construction management, and systematic and dynamic management of the construction organization design is carried out during the construction process, After the construction drawings are issued, the detailed construction scheme and construction operation instructions shall be prepared for supplementation and modification, so that the project construction is under the all-round and whole process monitoring.