Mingzhu East Road Project - Safety Supervision Rules
Introduction: New construction of motorway and non motorway works of the second bid section of the eastward extension project of Mingzhu East Road (Kunyuan Driving School K1+050 - Jingang Road): the total length of the new road is 1150 meters, and the road control red line is 60 meters. Main construction contents:? The cement stabilized layer of 13.5m wide machine and non mixed lanes is 34155m2 (with a thickness of 7cm and a structural form of 4+3), the sidewalk of 4m wide is 9200m2 (M7.5 mortar is paved with pressed bricks), the sidestones of the motorway are 4600m long, and the C15 concrete slope protection of the motorway is 4600m long. Bury 600m Φ 400 concrete crossing pipe. The newly excavated 10m wide central green belt treehouse is 1150m long, 13800m3 of earthwork is replaced for the central green belt, 1150m wide treehouse is excavated on both sides of the motorway, 6900m of earthwork is replaced for the treehouse, 216m Φ 70 green crossing pipes are buried, and 15 inspection wells are built. A 170 m farmland irrigation channel with an upper opening width of 1.5 m, 56 cast-in-place street lamp foundations and inspection wells, 2315 m six hole pipe blocks for street lamps, and 795 m Φ 300 concrete pipes will be installed.