Uploaded on: August 22, 2014 16:58:22 come from: Water supply and drainage / water treatment / waterworks
zero
2.02 points

Project overview: This project is the student activity center in the new campus of Tieling Normal University, with a total building area of 5899.54m, a building height of 20.750m, and an indoor and outdoor height difference of 0.750m. The design scope of the project includes: domestic water supply system, drainage system, hydrant water supply system, automatic sprinkler system and building fire extinguisher configuration. The drawings include: design description, water supply and drainage plan of each floor, and pipeline system diagram.

 Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 1

Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 1

 Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 2

Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 2

 Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 3

Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 3

 Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 4

Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 4

 Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 5

Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 5

 Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 6

Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 6

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!