Uploaded on: August 22, 2014 16:58:22 come from: Water supply and drainage / water treatment / waterworks
zero
2.02 points

Project overview: This project is the student activity center of the new campus of Tieling Normal University, Architecture The total area is 5899.54m, the building height is 20.750m, and the height difference between indoor and outdoor is 0.750m. The design scope of this project includes: domestic water supply recycled water , drainage system, fire hydrant water supply system, automatic sprinkler system and building fire extinguisher configuration. drawing Including: design description, water supply and drainage plan of each floor, and pipeline system diagram.

 Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 1

Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 1

 Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 2

Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 2

 Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 3

Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 3

 Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 4

Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 4

 Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 5

Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 5

 Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 6

Water supply and drainage design and construction drawing of a university activity center on the fourth floor - Figure 6

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment