engineering Updated: 2024-06-24 01:27:56

This topic is an online civil engineering design topic. All the content comes from the information sharing related to engineering design carefully selected with the online civil forum and database. Civil engineering online is a vertical website for domestic professional buildings, which contains a lot of civil engineering professional information to help civil engineers grow. For more road engineering design information, please visit the official website of civil engineering online.

already existing Subscribed by

  •  Picture 1 of decoration construction drawing

    Share to everyone ... View details

    User: Cool wind ha ha Views: two Time: 2024-06-26
  •  Picture 1 of current water conservancy events

    Design sketch of Xuanwei Reservoir On June 25, Xuanwei Reservoir, a major national water conservancy project, was started in Xuanwei Town, Qiandongnan Autonomous Prefecture, Guizhou Province. The commencement of Xuanwei Reservoir Project is one of the control hub projects included in the 14th Five Year Plan for Water Safety Assurance. The reservoir is located in the main stream of Qingshui River at the upstream of Yuanjiang River in Majiang County, Qiandongnan Miao and Dong Autonomous Prefecture. The project task is mainly to prevent flood and supply water, combine irrigation and give consideration to power generation. It is a Class II large (2) reservoir. The construction includes the head hydroproject and water supply and irrigation project. engineering ... View details

    User: Independent sunglasses Views: three Time: 2024-06-26
  •  Water supply and drainage database picture 1

    #1 Common problem of valve leakage ① Leakage at the packing part of valve housing. (Connection between valve body and bonnet); ② Leakage of valve disc sealing surface. Hazard ① Leakage affects the normal use function of the system. ② Leakage causes corrosion of valve parts, affecting their service life and appearance quality. ③ Leakage wastes water resources and affects energy conservation and environmental protection. Relevant Code GB50242-2002 Code for Acceptance of Construction Quality of Water Supply and Drainage and Heating Works ... View details

    User: Sun Lidong Views: two Time: 2024-06-26
  • 3 Construction process of foundation pit support 3.1 After site cleaning and preliminary preparation, the construction site shall be cleaned to remove surface rocks, tree branches and other disturbing objects, and inspect certain underground areas to determine whether there are obstacles such as underground drainage pipelines. If there are obstacles, timely exchange and communication with relevant departments shall be conducted, and the opinions given by relevant departments shall be taken into consideration, The obstacles shall be properly treated to prevent the existing obstacles from interfering with the subsequent foundation pit support construction. 3.2 Earthwork excavation construction shall be carried out after the completion of the preliminary preparation and site cleaning of earthwork excavation. For this construction project, the scale is relatively large ... View details

    User: wux7788_6569 Views: one Time: 2024-06-26
  • 1、 The settlement of projects with different scopes determines the project price at the construction stage, including construction cost, installation cost, etc; The final account of completion includes all the actual costs in the whole process from raising to completion and production, including construction engineering costs, installation engineering costs, equipment and tools purchase costs and reserve costs, as well as supervision costs, design costs, construction unit management costs and other costs. 2、 The settlement of different projects of the main body is carried out between the construction unit and the construction unit, and there are two equal main bodies; The final accounts of the project are collected, distributed, summarized and prepared by the construction unit for the costs incurred in the project. There is only one main body. 3、 Time ... View details

    User: A muscular bow tie Views: one Time: 2024-06-26
  •  Cost management picture 1

    The "engineering contract" runs through the whole process of a project from bidding to contract signing, project implementation, and final completion settlement. When it comes to engineering disputes, the contract is also the first thing to look at, so contract management plays a vital role in project implementation. The preparation and review of the project cost at each stage is also based on the contract terms. On January 19, 2022, the Ministry of Housing and Urban Rural Development issued the Notice of the Ministry of Housing and Urban Rural Development on Printing and Distributing the "Fourteenth Five Year Plan" Construction Industry Development Plan, which once again proposed to strengthen the construction unit's responsibility for cost control, strictly implement the management of construction contract performance, and comprehensively implement the settlement and payment of construction costs ... View details

    User: Serious skateboard Views: one Time: 2024-06-26
  • Source: Ma Nan talked about the cost completion settlement, which refers to the final project cost prepared according to the completion drawings, meeting minutes, design changes, site visas and other materials related to the project cost after the completion of the project. It is the final summary after the completion acceptance of the project or each sub item, and shall ensure that the settlement scope, content and pricing standard are consistent with the contract scope; The quantities shown in the as built drawings shall be consistent with the actual completion, and accurate calculation shall be carried out; The completed works and services, supplied materials and equipment must meet the quality requirements agreed in the contract and pass the acceptance. In combination with the completion record and profit final settlement, the auditor should pay attention to ... View details

    User: Elegant bicycle Views: one Time: 2024-06-26
  •  Cost management picture 1

    Foreword With the fluctuation of the real estate market, the increasing regulation of the real estate policy, the profits of real estate enterprises have been constantly compressed, especially due to the impact of the epidemic, the sales of major real estate companies have received a huge impact. Under these circumstances, cost optimization has again been put on the agenda of major real estate companies in all aspects of cost optimization, However, the cost reduction that may be brought about by the relocation of civil air defense is often ignored. Today, I will tell you how to reasonably use the relocation of civil air defense policies to reduce the cost of project development Catalog 1 What is the civil air defense basement 2 ... View details

    User: A muscular bow tie Views: two Time: 2024-06-26
  •  Project supervision picture 1

    What supervision qualification is required for power engineering? Some friends may not understand this problem very well. In order to solve your problems, I have sorted out the relevant content introduction today. Let's have a look if you are interested! Description of qualification standards for electric power engineering (1) It has the qualification of independent legal person and the registered capital is not less than 1 million yuan. (2) The technical director of the enterprise shall be a registered supervision engineer with more than 10 years of experience in engineering construction. (3) Registered supervision engineer, registered cost engineer, first-class registered constructor, first-class registered architect, first-class note ... View details

    User: 6600 overlord Views: two Time: 2024-06-26
  • 1、 The Employer's behavior has potential claim opportunities. 1) Economic losses caused by the breach of the original bid price or contract package price after winning the bid due to errors, omissions or discrepancies in the bidding documents provided by the Employer; 2) The Owner fails to deliver the construction site according to the contract; 3) The Owner fails to handle land acquisition, young trees compensation, house demolition, removal of ground, overhead and underground obstacles, etc. within the time limit specified in the contract. The construction site does not have or does not fully meet the construction conditions; 4) The Owner fails to comply with the contract ... View details

    User: A muscular bow tie Views: two Time: 2024-06-26
  • 1 In case of invalid construction contract, how to apply the quality standard, payment time and other terms agreed in the contract? Answer: Article 793 of the Civil Code of the People's Republic of China stipulates that "the construction contract of a construction project is invalid, but if the construction project has passed the acceptance, the contractor can be compensated at a discount according to the agreement on the project price in the contract." Article 6 of the Interpretation of the Supreme People's Court on the Application of Law in the Trial of Construction Contract Dispute Cases (I) stipulates that, "No construction contract ... View details

    User: Melon eating girl Views: one Time: 2024-06-26
  • Two years later, the standard of the Ministry of Housing and Urban Rural Development issued the "Pricing Standard of the Bill of Quantities of Construction Projects (Draft for Comments)" again on November 8, 2023. (hereinafter referred to as the "New Draft for Comments"), which is different from the previous version (November 17, 2021, hereinafter referred to as the "Old Draft for Comments") after its release, has been widely forwarded and rarely analyzed, This may be due to the fact that the "New Draft for Comments" has been greatly revised compared with the previous version, and there are significant changes in both the structural design of the entire standard and the specific terms, which may still be being digested by the whole industry. This official account is from ... View details

    User: Serious skateboard Views: five Time: 2024-06-26
  •  Project management picture 1

    1、 Efficiency creation planning point of foundation pit dewatering project 1. The original design scheme for adding dewatering wells did not include dewatering wells. Through communication with the survey unit, the owner and the designer according to the description in the hydrogeological survey report, dewatering wells were added before construction, and a separate quotation was made. 2. The original dewatering scheme for deep pits does not include special treatment for local deep pit dewatering. Before the construction of local deep pits, we communicated with the owner that the original dewatering scheme could not meet the construction conditions of local deep pits, so additional local deep pit dewatering is required, and then we reported the scheme again ... View details

    User: Wangwang Xuemi Baby Views: two Time: 2024-06-26
  •  Picture 1 of building water supply and drainage

    Construction engineering design generally includes two stages: preliminary design and construction drawing design. The preliminary design document consists of four parts: design specification, design drawings, main equipment, material list and project budget. Its composition shall include cover, preliminary design document directory, design specification, drawings, main equipment and material list and project budget. 1. When the scheme design is determined to be carried out, the plane position of the building, the number of floors and uses of the building, the characteristics of the building appearance, the terrain and roads around the building should be understood from the architectural drawings. It is also necessary to know the specific location of the municipal water supply pipeline and the pipe diameter and burial depth of the pipe section where the inlet pipe is allowed to be connected ... View details

    User: Clouds Views: five Time: 2024-06-26
  •  Construction picture 1

    Source: Copyright of Baidu Library belongs to the original author ... View details

    User: 6600 overlord Views: three Time: 2024-06-26
  • CCTV exposes the fake project of rural domestic sewage treatment: why does the heartwarming project become a "bad project" repeatedly? Yesterday (23rd), CCTV's "Financial Investigation" received feedback from some people and carried out a media investigation on the fraud of rural domestic sewage treatment projects. After investigation, it is found that the reflected community has built sewage wells, but they are just decoration, and the sewage treatment facilities are in vain; The electric wire was built into the sewage well, and the cement pavement was broken as soon as it was cut, and the reconstruction money was falsely claimed; The exhaust pipe of the septic tank is symbolically placed, so the old man unexpectedly appears on the toilet change list and has passed the acceptance at the district and city levels; Sewage backflow and septic tank sewage overflow in rainy days ... View details

    User: Yj Blue sky Views: four Time: 2024-06-26
  • CCTV exposure: "fake project" of rural domestic sewage treatment! The septic tank sewage overflows the streets and alleys, and the toilet reform subsidy has been falsely claimed. The central government has always listed rural domestic sewage treatment as a key work in many policies such as the construction of beautiful villages, the improvement of rural residential environment, and so on. It is also one of the practical things that rural people most expect to improve people's livelihood to make up for the weakness of rural domestic sewage treatment. However, recently, the Financial Survey received some reports from the masses that the rural domestic sewage treatment project in their village could not be used normally at all. It was a "tofu dregs" project and a "half baked" project. 1. Well built sewage well is just for decoration, sewage treatment facilities ... View details

    User: Yj Blue sky Views: two Time: 2024-06-26
  •  Structure database picture 1

    The technology of planting steel bar glue is a common method of building structure reinforcement, which can improve the bearing capacity and seismic performance of the structure by embedding steel bar into the original concrete structure and using the planting steel bar glue for bonding. It is very important to understand the construction conditions before carrying out the reinforcement with planting glue. Only when these conditions are met, can the reinforcement effect reach the expected goal. It is very important to know the strength of the concrete when planting reinforcement glue. If the new member is a cantilever structure, the concrete strength of the original member shall not be lower than C25; If the new component is of other types ... View details

    User: Shibang reinforcement material Views: six Time: 2024-06-25
  •  Construction BIM application picture 1

    The specific implementation process of BIM technology application for Tianjin Metro Line Z2 project mainly includes: first, basic modeling. Currently, 80% of the two station structure modeling has been basically completed, which can support relevant deepening work; The second is construction application. The project puts forward relevant application requirements, and appoints one person as BIM technician to be responsible for linking personnel in all positions of the project. In the process of construction scheme disclosure, BIM technicians timely report and implement, so that BIM and construction can be integrated; The third is to improve the data. During the construction process, one or part of the components can be marked according to the schedule. Including construction date, completion date, yes ... View details

    User: Happy signing pen Views: seven Time: 2024-06-25
  • #1. Problems and preventive measures reflected by the masses in building fire protection design 1. The narrow elevator hall and passageway on the first floor are dissatisfied with the fire protection passageway on the first floor of residential buildings. The width of the fire protection passageway on the first floor is not less than 1.1m according to the national building design fire protection code. General construction projects can meet this requirement. The original clear width of some project passageways is 1.2m, but in order to improve the decoration effect, stone hanging process is often used for secondary decoration, which will reduce the width of evacuation passageways by about 0.1m. It is suggested that the construction design unit should consider that the passageway in the public area should be designed above 1.3m to meet the needs of the masses ... View details

    User: wx_02463058 Views: two Time: 2024-06-25