The data is the construction drawing of a high-rise pure shear structure, with 15 drawings in total, including: basement roof formwork and beam slab reinforcement drawing, first floor slab formwork and beam reinforcement drawing, second floor slab formwork and beam reinforcement drawing, third floor slab formwork and beam reinforcement drawing, fifth, ninth, thirteenth, seventeenth floor slab formwork and beam reinforcement drawing (seventh, eleventh, fifteenth floor slab formwork and beam reinforcement drawing), fourth, eighth, twelfth,