The bridge is located in xx Village, xx Town, xx County, close to the National Highway 319, with convenient traffic conditions. The starting and ending chainages of the bridge are K75+706.611 ~ K75+986m. There is a long route chain (K75+725.939=K75+707.328) on the bridge, with a total length of 296m. The bridge plane is located on the circular curve of the main line R=1020m; The longitudinal slope on the bridge is 1.365% and - 3.7% respectively; Piers and abutments are arranged radially. The whole bridge is divided into two parts: (3x40) m+(4x40) m; The superstructure adopts prestressed concrete (post tensioned) T beam, and adopts the method of "simple support first and then structural continuity" for construction; The substructure abutment adopts U-shaped abutment and open cut expanded foundation; Column piers and rock socketed dug pile foundations are adopted for bridge piers.