This data is the construction drawing of the powerhouse hydroproject of the hydropower station, mainly including the engineering topographic map, powerhouse construction drawing, channel and forebay construction drawing, turbine floor and volute floor construction drawing, generator floor, draft tube floor construction drawing, intake gate lifting platform construction drawing, tailrace channel construction drawing, powerhouse flood wall reinforcement drawing, etc. 20 sheets, prepared in 2010.