Measuring building, scientific research center building, testing line facilities, among which Workshop IV, Workshop V and Workshop VI belong to Phase II. The office building, the experimental center (two buildings), the machine research building, the detection building, and the scientific research center building are below the six buildings, which is an integral super deep foundation pit. The effective space of the foundation pit is large (the building area reaches 11268m2, and the excavation depth is