1. Before construction, engineering technicians shall make technical disclosure to the team, including construction content, quantities, construction sequence, construction scheme, technical requirements, construction period arrangement, safety assurance measures, etc. 2. The factory acceptance certificate of steel pipe installation pipe section shall be provided, and all inspection and acceptance records shall be required. 3. Steel pipe installation control point (mileage point, height