Construction content: civil engineering, water supply and drainage, electrical, fire water, fire alarm, heating and air conditioning, intelligent installation works and outdoor auxiliary landscape greening works (excluding power transformation and distribution, network center machine room equipment (including UPS), outdoor ground source heat pump system, refrigerator room, cooling tower, expansion tank, stage lighting equipment (including surface light bridge, etc.), elevator, indoor hanging machine Other large