1、 Project overview A bridge in MA7 contract section of xx expressway, the left line bridge is 289m long, the bridge opening is 8 × 35m prestressed concrete continuous T beam, the right line bridge is 324m long, the bridge opening is 9 × 35m prestressed concrete continuous T beam, the substructure is column pier, rib abutment, and the foundation is Φ 180 bored pile. Karst is relatively developed within the scope of a bridge site, with the number of karst caves