In the process of pouring underwater concrete, measures must be taken to prevent the tremie from water ingress and blocking, pipe burying and hole collapse; In case of any of the above situations, the reason shall be identified, the operation shall be improved and handled in a timely manner. In case of serious hole collapse, the pouring of concrete must be stopped immediately, the tremie and reinforcement skeleton shall be put forward, and the backfilling shall be carried out according to the technical requirements; In case of broken pile, the treatment scheme shall be studied with the design and construction (supervision).