The second phase of the sewage collection and water transmission pipeline project starts from the Hengjiangli channel of Xiapu Binjiang Park, enters the Ma Zha Xiapumping station along the Xidi Road, is lifted and pressurized by the submersible sewage pump, and then goes from the pumping station to the No. 14 wharf, along the Xizhi River, along the Shanghuancheng East Road, through the Dongxinqiao bridgehead, takes the Yanjiang Road in the west of the bridge to the Dukou Station, and passes through the ×× embankment to the green space next to the Seventh Middle School, Go along Xiajiao Jiangbian Road to the sewage of Xiajiao Sugar Factory