Firstly, the drill shall be firmly in place, and the deviation between the center of the drill bit and the center of the pile casing shall not be more than 2cm. After the drill bit is in place, the punching shall be started. At first, the drill pipe shall be slightly lifted, the mud shall be beaten in the pile casing, the mud pump shall be started for circulation, and the drilling shall be started after the mud is uniform. The drilling speed shall be properly controlled. The low-speed drilling shall be carried out at the bottom corner of the pile casing, and the drilling shall be carried out at the normal speed after the bottom corner is 1m below the bottom corner.